Healthy Buildings International

Leading with Experience

Suite 2.06, Level 2
29-31 Solent Circuit, Norwest, NSW 2153
Email : hbi@hbi.com.au
Phone: 02 9659 5433
A.B.N 39 003 270 693

  • Home
  • Our Clients
  • Services
    • Indoor Environments
    • Legionella Risk Management
    • Asbestos Management
    • Hazardous Construction Materials
    • Hazardous Substances and Dangerous Goods
    • Contaminated Land
    • Occupational Hygiene
    • Environmental Management
    • Green Building Design & Performance
    • Sustainability in Infastructure
  • Safety, Quality and Environment
  • Projects
  • News
  • Client Login
  • About Us
  • Contact Us

Nundah Bank Third Track, Upper Hunter Valley Alliance

September 15, 2014 By HBI

In 2011 approval was granted to the Australian Rail Track Corporation to construct and operate the project known as the Nundah Bank Third Track Project delivered by the Upper Hunter Valley Alliance. This project involved the construction and operation of a third rail track and ancillary infrastructure adjacent to the Main North Line between the […]

Filed Under: Category 1, Projects, railway

Sydney Opera House Vehicle and Pedestrian Safety Project

September 15, 2014 By HBI

The Sydney Opera House, Vehicle and Pedestrian Safety Project has been designed to address the long standing objectives of separating heavy vehicles from pedestrian traffic on the forecourt of the Sydney Opera House thereby improving public safety; improving the visitor’s experience and views to the Sydney Opera House; as well as improving the functioning of […]

Filed Under: community improvements, Major Infrastructure, Projects

Port Kembla Cement Grinding Facility

September 15, 2014 By HBI

This joint venture between Cement Australia and Ecocem provided for the construction of a grinding mill on the Outer Harbour of Port Kembla. The project included installation of a grinding mill, materials storage, clinker storage, site infrastructure and a silo bank for storage and despatch of finished product. Our role as Environmental Representative was to […]

Filed Under: Projects

Glenfield to Leppington Rail Link, South West Rail Project

September 15, 2014 By HBI

As part of the South West Rail Link, the Glenfield to Leppington project has changed the landscape of passenger rail in Sydney’s south west…. The Glenfield to Leppington project incorporates a new twin track passenger rail line approximately 11 km in length from Glenfield to Leppington and associated infrastructure, including construction of two new stations […]

Filed Under: Category 1, Projects

Kingsgrove to Revesby Quadruplication

September 15, 2014 By HBI

The K2RQ project provided additional railway tracks between Kingsgrove and Revesby stations passing Beverly Hills, Narwee, Riverwood and Padstow stations…. The Kingsgrove to Revesby Quadruplication included construction of 14 kilometres of track, crossovers and turnouts, cutting and embankment formation widening, maintenance access, retaining walls, slope stabilisation, stormwater drainage and culvert extensions, and supporting electrical infrastructure, […]

Filed Under: Category 1, Projects

Inner West Light Rail Extension

September 15, 2014 By HBI

The Inner West Light Rail extension feature excellent adaptive re-use of the former Rozelle Goods Line and existing rail corridor This project extended the Light Rail system from Lilyfield to Dulwich Hill in Inner Western Sydney, along the existing Rozelle Goods Line. Infrastructure works included track works, additional stabling, nine new light rail stops and […]

Filed Under: Category 1, Projects, railway

Long Term Train Support Facility

September 15, 2014 By HBI

Aurizon owns 255 hectares of industrial land located at Hexham in the Hunter Valley of New South Wales and proposes to redevelop approximately 30 hectares of the site to construct a Train Support Facility (TSF). The TSF will provide for the relocation of fuelling, provisioning and inspection activities currently located at Kooragang Island and Carrington. […]

Filed Under: Projects

North West Rail Link Sky Train

September 15, 2014 By HBI

The second stage of the North West rail link includes the “Sky train” supporting a a new high frequency single deck train system to deliver rapid transport services in Sydney’s North West… The NWRL project is a key priority for the NSW Government. The NWRL will deliver a new high frequency single deck train system […]

Filed Under: Projects

North West Rail Link Tunnel

September 15, 2014 By HBI

The first stage of the North West rail link includes twin underground railway tunnels between Bella Vista and Epping in Sydney’s North West… The NWRL project is a key priority for the NSW Government. The NWRL will deliver a new high frequency single deck train system initially operating as a shuttle between Cudgegong Road and […]

Filed Under: Projects

NABERs Ratings

September 15, 2014 By HBI

NABERS Accredited Tester

NABERS ratings have increasingly become a valuable tool for building owners or managing agents to attractively lease their office spaces to attractively lease their office spaces. Whilst Energy ratings are mandatory under the CBD program for any office space for lease or sale, Indoor Environment ratings are used to inform potential tenants of the suitability […]

Filed Under: Category 3, indoor air, Projects

« Previous Page
Next Page »

Other Information about HBI

  • Talent Recruitment
  • Terms of Use
  • Privacy
  • Home

Contact Us

Healthy Buildings International

Address:
Suite 2.06, Level 2
29-31 Solent Circuit
Baulkham Hills NSW 2153

Email: hbi@hbi.com.au
Phone: 61 (0) 2 9659 5433
A.B.N: 39 003 270 693

Latest News

WELL AP now on board

Congratulations  to  Jo Robertson of Healthy … [Read More...]

We have moved…..

After more than 15 years operating and expanding … [Read More...]

Glenfield to Leppington Rail line opens…

Well done to all involved in the construction of … [Read More...]

© 2018 Healthy Buildings International Pty Ltd. All Rights Reserved 

 Website by Dunjoko Designs