Healthy Buildings International

Leading with Experience

Suite 2.06, Level 2
29-31 Solent Circuit, Norwest, NSW 2153
Email : hbi@hbi.com.au
Phone: 02 9659 5433
A.B.N 39 003 270 693

  • Home
  • Our Clients
  • Services
    • Indoor Environments
    • Legionella Risk Management
    • Asbestos Management
    • Hazardous Construction Materials
    • Hazardous Substances and Dangerous Goods
    • Contaminated Land
    • Occupational Hygiene
    • Environmental Management
    • Green Building Design & Performance
    • Sustainability in Infastructure
  • Safety, Quality and Environment
  • Projects
  • News
  • Client Login
  • About Us
  • Contact Us
You are here: Home / Projects

Revesby Turnback Project

September 15, 2014 By HBI

As part of the NSW Government’s plans to free up the congestion experienced on the NSW rail network, this Clearway’s project was initiated to provide capability for rolling stock to return to the Sydney CBD increasing service reliability…. The Project involved the design and construction of a rail turnback facility and associated works at Revesby […]

Filed Under: Category 1, Projects, railway

Revesby Commuter Car Park

September 15, 2014 By HBI

The Revesby Commuter Car Park Project comprised the construction of a split level multistorey car park with approximately 720 car spaces north-east of Revesby Station. The car park is being constructed on the site of an existing ground level car park and a site which previously operated as a car wash between Simmons Street and […]

Filed Under: Category 2, community improvements, Projects

MacDonaldtown Stabling Yard

September 15, 2014 By HBI

MacDonaldtown Stabling Yard

As part of NSW Government’s plans to free up the congestion on the CBD rail network, this Clearway’s project was initiated to improve stabling capacity … This early Clearway’s project involved constructing new stabling facilities adjacent to MacDonaldtown Station. The construction of a stabling facility close to the city significantly reduces empty train movements on […]

Filed Under: Category 1, Projects, railway

Rozelle Goods Line – Rail Track Maintenance and Reconstruction

September 15, 2014 By HBI

This interesting project involved rail track maintenance and reconstruction of the existing track…. (maintaining the in-situ track alignment), which included carefully controlled de-vegetation of specific areas within the corridor in a know habitat for the threatened Long Nose Bandicoot, ballast cleaning and track reconditioning focused on the Lilyfield tunnel, rail work including re-sleepering and re-railing […]

Filed Under: Category 1, Projects, railway

Nundah Bank Third Track, Upper Hunter Valley Alliance

September 15, 2014 By HBI

In 2011 approval was granted to the Australian Rail Track Corporation to construct and operate the project known as the Nundah Bank Third Track Project delivered by the Upper Hunter Valley Alliance. This project involved the construction and operation of a third rail track and ancillary infrastructure adjacent to the Main North Line between the […]

Filed Under: Category 1, Projects, railway

« Previous Page
Next Page »

Other Information about HBI

  • Talent Recruitment
  • Terms of Use
  • Privacy
  • Home

Contact Us

Healthy Buildings International

Address:
Suite 2.06, Level 2
29-31 Solent Circuit
Baulkham Hills NSW 2153

Email: hbi@hbi.com.au
Phone: 61 (0) 2 9659 5433
A.B.N: 39 003 270 693

Latest News

WELL AP now on board

Congratulations  to  Jo Robertson of Healthy … [Read More...]

We have moved…..

After more than 15 years operating and expanding … [Read More...]

Glenfield to Leppington Rail line opens…

Well done to all involved in the construction of … [Read More...]

© 2018 Healthy Buildings International Pty Ltd. All Rights Reserved 

 Website by Dunjoko Designs