As part of the NSW Government’s plans to free up the congestion experienced on the NSW rail network, this Clearway’s project was initiated to provide capability for rolling stock to return to the Sydney CBD increasing service reliability…. The Project involved the design and construction of a rail turnback facility and associated works at Revesby […]
Revesby Commuter Car Park
The Revesby Commuter Car Park Project comprised the construction of a split level multistorey car park with approximately 720 car spaces north-east of Revesby Station. The car park is being constructed on the site of an existing ground level car park and a site which previously operated as a car wash between Simmons Street and […]
MacDonaldtown Stabling Yard
As part of NSW Government’s plans to free up the congestion on the CBD rail network, this Clearway’s project was initiated to improve stabling capacity … This early Clearway’s project involved constructing new stabling facilities adjacent to MacDonaldtown Station. The construction of a stabling facility close to the city significantly reduces empty train movements on […]
Rozelle Goods Line – Rail Track Maintenance and Reconstruction
This interesting project involved rail track maintenance and reconstruction of the existing track…. (maintaining the in-situ track alignment), which included carefully controlled de-vegetation of specific areas within the corridor in a know habitat for the threatened Long Nose Bandicoot, ballast cleaning and track reconditioning focused on the Lilyfield tunnel, rail work including re-sleepering and re-railing […]
Nundah Bank Third Track, Upper Hunter Valley Alliance
In 2011 approval was granted to the Australian Rail Track Corporation to construct and operate the project known as the Nundah Bank Third Track Project delivered by the Upper Hunter Valley Alliance. This project involved the construction and operation of a third rail track and ancillary infrastructure adjacent to the Main North Line between the […]