Healthy Buildings International

Leading with Experience

Suite 2.06, Level 2
29-31 Solent Circuit, Norwest, NSW 2153
Email : hbi@hbi.com.au
Phone: 02 9659 5433
A.B.N 39 003 270 693

  • Home
  • Our Clients
  • Services
    • Indoor Environments
    • Legionella Risk Management
    • Asbestos Management
    • Hazardous Construction Materials
    • Hazardous Substances and Dangerous Goods
    • Contaminated Land
    • Occupational Hygiene
    • Environmental Management
    • Green Building Design & Performance
    • Sustainability in Infastructure
  • Safety, Quality and Environment
  • Projects
  • News
  • About Us
  • Contact Us
You are here: Home / Projects / North West Rail Link Tunnel

North West Rail Link Tunnel

September 15, 2014 By HBI

TBM-cutter-head cropThe first stage of the North West rail link includes twin underground railway tunnels between Bella Vista and Epping in Sydney’s North West…

The NWRL project is a key priority for the NSW Government. The NWRL will deliver a new high frequency single deck train system initially operating as a shuttle between Cudgegong Road and Chatswood. Infrastructure to be built in by the Tunnel and Station Civil works includes twin underground railway tunnels between Bella Vista and Epping with numerous cross passages between the twin underground railway tunnels, sumps, nozzle enlargements at stations and service facilities, a crossover cavern at Castle Hill to allow trains to cross from one track to another, a services facility shaft adjacent to Beecroft Road at Epping, and a services facility shaft adjacent to Castle Howard Road at Cheltenham, station excavations at Bella Vista, Norwest, Showground, Castle Hill and Cherrybrook, connections to the existing Epping to Chatswood Rail Line down track and up track stub tunnels and interface local area works.

Our role as Environmental Representative was to independently oversee the implementation of all environmental management plans and monitoring programs, independently advise the Proponent on its compliance obligations against all relevant requirements of the Concept Plan, Project Approval and Statement of Commitments, permits and licenses and have the authority and independence to require reasonable steps to be taken to avoid or minimise unintended or adverse environmental impacts.

Tweet
PinIt

Filed Under: Projects

Other Information about HBI

  • Talent Recruitment
  • Terms of Use
  • Privacy
  • Home

Contact Us

Healthy Buildings International

Address:
Suite 2.06, Level 2
29-31 Solent Circuit
Baulkham Hills NSW 2153

Email: hbi@hbi.com.au
Phone: 61 (0) 2 9659 5433
A.B.N: 39 003 270 693

Latest News

WELL AP now on board

Congratulations  to  Jo Robertson of Healthy … [Read More...]

Glenfield to Leppington Rail line opens…

Well done to all involved in the construction of … [Read More...]

Congratulations on the Banksia!

The team at Healthy Buildings International would … [Read More...]

© 2026 Healthy Buildings International Pty Ltd. All Rights Reserved 

 Website by Dunjoko Designs