Healthy Buildings International

Leading with Experience

Suite 2.06, Level 2
29-31 Solent Circuit, Norwest, NSW 2153
Email : hbi@hbi.com.au
Phone: 02 9659 5433
A.B.N 39 003 270 693

  • Home
  • Our Clients
  • Services
    • Indoor Environments
    • Legionella Risk Management
    • Asbestos Management
    • Hazardous Construction Materials
    • Hazardous Substances and Dangerous Goods
    • Contaminated Land
    • Occupational Hygiene
    • Environmental Management
    • Green Building Design & Performance
    • Sustainability in Infastructure
  • Safety, Quality and Environment
  • Projects
  • News
  • Client Login
  • About Us
  • Contact Us

Cronulla Line Duplication and Upgrade

November 11, 2014 By HBI

The Cronulla Rail Line Duplication and Upgrade project involved the upgrade and duplication of 14 kilometers of track.Construction of numerous over bridges, construction of 8 lane stabling facility, upgrade to State Heritage Listed Cronulla Railway Station, vegetation clearing to enable works, installation of drainage structures, installation of bridges and associated road and footpath pavement works, […]

Filed Under: Category 1, environment, Major Infrastructure, railway

Wynyard Walk

November 11, 2014 By HBI

The Wynyard Walk Project provides a world-class, fully-accessible pedestrian link between Wynyard Station, the developing CBD western corridor and Barangaroo. The walkway allows pedestrians to get from Wynyard transport hub to the Barangaroo waterfront in approximately six minutes, avoiding steep inclines and all road crossings. Key features include a new western entrance to Wynyard Station […]

Filed Under: Category 2, community improvements, environment, Major Infrastructure, Projects, railway

Legionella 2nd Testing – a safer bet !!!

September 20, 2014 By HBI

Cooling Tower

Healthy Buildings International continues to provide testing of cooling tower waters to several nationally based building owner and occupier portfolios. These clients build duplicate testing into their risk management strategies for a second level of assurance to mitigate risk from uninsurable legionella exposure.

Filed Under: Category 4, legionella, Projects

Inner West Light Rail opens for business

September 16, 2014 By HBI

Under less than fantastic weather conditions, the new $174 million Inner West Light Rail opened for business on Thursday 27 March. HBI provided environmental services to Transport for NSW for the duration of the project delivery. HBI continues to be involved as the next portion of the project, “streetscaping” access points around the Light Rail […]

Filed Under: Category 1, Major Infrastructure, News, railway

Newcastle Rail Platform Extension

September 15, 2014 By HBI

The works included an extension of the Hamilton Railway Station’s platform, extension of the Wickham Railway Station’s platform, and extension of the Civic Railway Station’s platform. Other works included construction of a single span bridge across Cottage Creek, construction of fencing and access steps associated with the extension, relocation of the existing signal and associated […]

Filed Under: Category 1, Projects, railway

Revesby Turnback Project

September 15, 2014 By HBI

As part of the NSW Government’s plans to free up the congestion experienced on the NSW rail network, this Clearway’s project was initiated to provide capability for rolling stock to return to the Sydney CBD increasing service reliability…. The Project involved the design and construction of a rail turnback facility and associated works at Revesby […]

Filed Under: Category 1, Projects, railway

Revesby Commuter Car Park

September 15, 2014 By HBI

The Revesby Commuter Car Park Project comprised the construction of a split level multistorey car park with approximately 720 car spaces north-east of Revesby Station. The car park is being constructed on the site of an existing ground level car park and a site which previously operated as a car wash between Simmons Street and […]

Filed Under: Category 2, community improvements, Projects

MacDonaldtown Stabling Yard

September 15, 2014 By HBI

MacDonaldtown Stabling Yard

As part of NSW Government’s plans to free up the congestion on the CBD rail network, this Clearway’s project was initiated to improve stabling capacity … This early Clearway’s project involved constructing new stabling facilities adjacent to MacDonaldtown Station. The construction of a stabling facility close to the city significantly reduces empty train movements on […]

Filed Under: Category 1, Projects, railway

Rozelle Goods Line – Rail Track Maintenance and Reconstruction

September 15, 2014 By HBI

This interesting project involved rail track maintenance and reconstruction of the existing track…. (maintaining the in-situ track alignment), which included carefully controlled de-vegetation of specific areas within the corridor in a know habitat for the threatened Long Nose Bandicoot, ballast cleaning and track reconditioning focused on the Lilyfield tunnel, rail work including re-sleepering and re-railing […]

Filed Under: Category 1, Projects, railway

Next Page »

Other Information about HBI

  • Talent Recruitment
  • Terms of Use
  • Privacy
  • Home

Contact Us

Healthy Buildings International

Address:
Suite 2.06, Level 2
29-31 Solent Circuit
Baulkham Hills NSW 2153

Email: hbi@hbi.com.au
Phone: 61 (0) 2 9659 5433
A.B.N: 39 003 270 693

Latest News

WELL AP now on board

Congratulations  to  Jo Robertson of Healthy … [Read More...]

We have moved…..

After more than 15 years operating and expanding … [Read More...]

Glenfield to Leppington Rail line opens…

Well done to all involved in the construction of … [Read More...]