The Cronulla Rail Line Duplication and Upgrade project involved the upgrade and duplication of 14 kilometers of track.Construction of numerous over bridges, construction of 8 lane stabling facility, upgrade to State Heritage Listed Cronulla Railway Station, vegetation clearing to enable works, installation of drainage structures, installation of bridges and associated road and footpath pavement works, […]
Wynyard Walk
The Wynyard Walk Project provides a world-class, fully-accessible pedestrian link between Wynyard Station, the developing CBD western corridor and Barangaroo. The walkway allows pedestrians to get from Wynyard transport hub to the Barangaroo waterfront in approximately six minutes, avoiding steep inclines and all road crossings. Key features include a new western entrance to Wynyard Station […]
Legionella 2nd Testing – a safer bet !!!
Healthy Buildings International continues to provide testing of cooling tower waters to several nationally based building owner and occupier portfolios. These clients build duplicate testing into their risk management strategies for a second level of assurance to mitigate risk from uninsurable legionella exposure.
Inner West Light Rail opens for business
Under less than fantastic weather conditions, the new $174 million Inner West Light Rail opened for business on Thursday 27 March. HBI provided environmental services to Transport for NSW for the duration of the project delivery. HBI continues to be involved as the next portion of the project, “streetscaping” access points around the Light Rail […]
Newcastle Rail Platform Extension
The works included an extension of the Hamilton Railway Station’s platform, extension of the Wickham Railway Station’s platform, and extension of the Civic Railway Station’s platform. Other works included construction of a single span bridge across Cottage Creek, construction of fencing and access steps associated with the extension, relocation of the existing signal and associated […]
Revesby Turnback Project
As part of the NSW Government’s plans to free up the congestion experienced on the NSW rail network, this Clearway’s project was initiated to provide capability for rolling stock to return to the Sydney CBD increasing service reliability…. The Project involved the design and construction of a rail turnback facility and associated works at Revesby […]
Revesby Commuter Car Park
The Revesby Commuter Car Park Project comprised the construction of a split level multistorey car park with approximately 720 car spaces north-east of Revesby Station. The car park is being constructed on the site of an existing ground level car park and a site which previously operated as a car wash between Simmons Street and […]
MacDonaldtown Stabling Yard
As part of NSW Government’s plans to free up the congestion on the CBD rail network, this Clearway’s project was initiated to improve stabling capacity … This early Clearway’s project involved constructing new stabling facilities adjacent to MacDonaldtown Station. The construction of a stabling facility close to the city significantly reduces empty train movements on […]
Rozelle Goods Line – Rail Track Maintenance and Reconstruction
This interesting project involved rail track maintenance and reconstruction of the existing track…. (maintaining the in-situ track alignment), which included carefully controlled de-vegetation of specific areas within the corridor in a know habitat for the threatened Long Nose Bandicoot, ballast cleaning and track reconditioning focused on the Lilyfield tunnel, rail work including re-sleepering and re-railing […]