Healthy Buildings International

Leading with Experience

Suite 2.06, Level 2
29-31 Solent Circuit, Norwest, NSW 2153
Email : hbi@hbi.com.au
Phone: 02 9659 5433
A.B.N 39 003 270 693

  • Home
  • Our Clients
  • Services
    • Indoor Environments
    • Legionella Risk Management
    • Asbestos Management
    • Hazardous Construction Materials
    • Hazardous Substances and Dangerous Goods
    • Contaminated Land
    • Occupational Hygiene
    • Environmental Management
    • Green Building Design & Performance
    • Sustainability in Infastructure
  • Safety, Quality and Environment
  • Projects
  • News
  • About Us
  • Contact Us
You are here: Home / Projects / Cooling Tower Testing

Cooling Tower Testing

September 15, 2014 By HBI

Cooling Tower
Project – Cooling Tower

Each year, cases of sickness or death are reported from exposure to Legionella pneumophila with Legionella infections in susceptible individuals caused by the inhalation of water aerosols containing the bacteria. HBI has, for a number of years, provided our clients with water testing of cooling towers which provides clients with results independent from those received from their Cooling Tower chemical providers.

HBI currently undertakes both primary and secondary water testing for a number of clients. With our certified cooling tower auditors, HBI can easily interpret test results, and have implemented risk based approaches for either the detection of Legionella, and/or high Heterotrophic Plate Counts.

HBI currently undertakes risk management plans for a large National client. This includes the mandatory risk management plans and the subsequent auditing of these plans throughout Victoria. Our qualified auditors develop plans that satisfy all legislative requirements or audit plans to ensure compliance with Victorian Health guidelines.

 

Tweet
PinIt

Filed Under: Projects

More Recent Projects

Cronulla Line Duplication and Upgrade

The Cronulla Rail Line Duplication and Upgrade project involved the upgrade and duplication of 14 kilometers of track.Construction of numerous over … [Read More...]

Wynyard Walk

The Wynyard Walk Project provides a world-class, fully-accessible pedestrian link between Wynyard Station, the developing CBD western corridor and … [Read More...]

Legionella 2nd Testing – a safer bet !!!

Healthy Buildings International continues to provide testing of cooling tower waters to several nationally based building owner and occupier … [Read More...]

Inner West Light Rail opens for business

Under less than fantastic weather conditions, the new $174 million Inner West Light Rail opened for business on Thursday 27 March. HBI provided … [Read More...]

Newcastle Rail Platform Extension

The works included an extension of the Hamilton Railway Station’s platform, extension of the Wickham Railway Station’s platform, and extension of the … [Read More...]

Other Information about HBI

  • Talent Recruitment
  • Terms of Use
  • Privacy
  • Home

Contact Us

Healthy Buildings International

Address:
Suite 2.06, Level 2
29-31 Solent Circuit
Baulkham Hills NSW 2153

Email: hbi@hbi.com.au
Phone: 61 (0) 2 9659 5433
A.B.N: 39 003 270 693

Latest News

WELL AP now on board

Congratulations  to  Jo Robertson of Healthy … [Read More...]

Glenfield to Leppington Rail line opens…

Well done to all involved in the construction of … [Read More...]

Congratulations on the Banksia!

The team at Healthy Buildings International would … [Read More...]

© 2026 Healthy Buildings International Pty Ltd. All Rights Reserved 

 Website by Dunjoko Designs